Before starting wiring and installation first of first carefully read the user manual is given by the product. As per the user manual connect drives to the power supply if a single-phase drive then connects only the L1 and L2 line and neutral. if the drive is three-phase then connect L1, L2, L3 three-phase and one neutral also.
Motor connections : The motor connects with the terminal U, V, W.
CN-1 CONNECTOR : CN-1 Connection is sequential inputs outputs connection comes with plc and hardware button sensor etc.
CN-2 CONNECTOR: CN-2 CONNECTOR connect to the encoder